The Jupiter Sweet Gas assests consist mainly of the Berland West Gas Plant and associated gathering facilities, along with the Pinto pipeline and the Wild River Plant #3 sales gas pipeline. These facilities are 100% owned and operated by Talisman Midstream and serve for the transportation and processing of sweet gas from the area to market.
The Berland assests consist of the Berland West Gas Plant, the North and South Berland pipelines and the Southlake compressor station. The Berland pipeline (North and South) is a 53 km, 8 inch diameter, dry (<4 lbs/mmcf water), high pressure pipeline that delivers gas to the Berland West Gas plant. The Berland West Gas Plant is a 100 MMcf/d refrigeration facility located at 4-36-58-24W5M. The plant is strategically-located on the TCPL mainline providing producers quick access to market. The Southlake facility located at 4-3-60-22W5M consists of ~3000 HP of compression along with dehydration, and delivers gas to the North Berland pipeline.
The Pinto pipeline is an 8 inch diameter pipeline that currently gathers sweet gas from the Harley/Pinto area and transports it to the either the Central Foothills Gas Gathering System or the Horse Gas plant. In the future there is potential to connect the Pinto system to the South Berland pipeline allowing gas to be processed at the Berland West Gas Plant.
The Wild River Plant #3 pipeline is a 10 inch pipeline that provides sales gas egress for the Talisman Wild River Plant to TransCanada.


